Procurement

Name of Work

CONSTRUCTION OF 103 KM ELECTRICAL LINE (HT AND LT & CONVERSION OVERHEAD ELECTRICAL LINES) WITH SUPPLY OF NECESSARY CONSTRUCTION MATERIALS WITH DISTRIBUTION TRANSFORMER UNDER IMIP-MIP.

Package No

CW-04/Additional Lot

Date of Commencement

16/01/2023

Date of Completion

30/06/2023

Name of Work

Farmers’ Distribution System, Stage—4: 5700 hac of Buried Pipe Systems with Pumps and Teleprepaid Meters for Muhuri Irrigation Project under under Irrigation Management Improvement Project

Package No

CW-07

Date of Commencement

01/01/2020

Date of Completion

30/12/2021

Name of Work

Farmers’ Distribution System, Stage-2: 5400 hac of Buried Pipe Systems with Pumps and Teleprepaid Meters for Muhuri Irrigation Project under under Irrigation Management Improvement Project

Package No

CW-05

Date of Commencement

01/11/2019

Date of Completion

30/04/2021

Name of Work

Turn Key Contract for (A) Construction of IXIo/14 M VA, 33/11 KVA Indoor Type Sub-Station and (B) Upgrading of Electrical Distribution (H T, LT Over Head Line) System for Muhuri Irrigation Project under Irrigation Management Improvement

Package No

CW-04 (NCB)

Date of Commencement

15/11/2018

Date of Completion

14/11/2020

Name of Work

Rehabilitation of Coastal Embankment, Re-excavation of Khal Group-I and Re- excavation of Khal Group-2 under Irrigation Management Improvement Project for Muhuri Irrigation Project during 2015-16, 2016-17 and 2017-18

Package No

CW-01

Date of Commencement

14/02/2016

Date of Completion

13/02/2018

Name of Work

Construction of new water control structures, sluices; re-habilitation of structures, sluices under Irrigation Management Improvement Project (IMIP) for Muhuri Irrigation Project (MIP) during 2016-17,2017-18,2018-19

Package No

CW-08A (ICB)

Date of Commencement

14/06/2017

Date of Completion

At a glance

Short Title IMIP
Ministry: MoWR
Executing Agency: BWDB
Development Partners:
ADB (Loan) Tk. 46121.00 Lac
GoB Tk. 10414.00 Lac
DPP Cost Tk. 56269.00 Lac
Commencement Date: July 2014
Completion Date: June 2024
Name of PD: Md. Rafius Sazzad, PEng.

Project Director

Eng. Md Rafius Sazzad, PEng

Joined as Project Director of Irrigation Management Improvement Project for Muhuri Irrigation Project on 31st July 2018

Important Links

Map

Social Links

Eng. Md. Rafius Sazzad, PEng, joined as Project Director of Irrigation Management Improvement Project for Muhuri Irrigation Project on 31st July 2018. He is an Additional Chief Engineer in Bangladesh Water Development Board Prior to joining the current post, he worked as a Superintendent Engineer and Executive Engineer of Irrigation Management Improvement Project for Muhuri Irrigation Project. Apart from this project, he worked in different offices of Bangladesh Water Development Board. He graduated with a BSc in Civil Engineering from KUET and received his PG Diploma (WRMS) in 2005 from the Hydroaid Institute in Italy. He joined the Bangladesh Water Development Board (BWDB) in 1993 as an Assistant Engineer. He has been served efficiently in various important river bank conservation, irrigation, flood control, and drainage projects of BWDB. During his tenure at the BWDB, he participated in various seminars in Japan, Indonesia, the Philippines, Thailand, Italy, France, and the Netherlands. He is a professional engineer and life fellow of IEB. He was born in 1968 in the Cumilla district to an aristocratic Muslim family.